
|
Construction Management |
|
With our experience in design and construction we have learned a few simple rules. 1. Design the equipment to be set easily. 2. Limit down time. Time down costs money. 3. The engineering company has to be on the job site at all critical times through out construction. 4. The largest loss of time in construction is due to lack of communication between contractors and Engineering design firms M&K Solves this problem by using Experienced Engineers and Construction managers. Our Construction Managers are Engineers by training. |
|
Setting pipe bridge with piping for Hydrogen Compressor installation. |
|
1635 West First Street, Suite 300 Granite City, IL 62040
Phone: 618-451-5150 Fax: 618-451-5151 |